Written Council consent and a Vehicle Crossing Permit are always required to repair, modify, relocate, reconstruct, or construct an additional vehicle crossing, or to undertake footpath or kerb and channel works.
Please note: Development sites with endorsed engineering plans can apply directly for a Vehicle Crossing Permit.
See fees and charges
The Vehicle Crossing Guidelines provide essential design requirements and considerations for constructing or altering vehicle crossings in Maroondah, including minimum distances from Council and utility assets.
Vehicle Crossing Guidelines(PDF, 1MB)
Vehicle Crossing Guidelines(DOCX, 771KB)
Use this form to apply for Council consent to repair, modify, relocate, reconstruct or construct an additional vehicle crossing, or undertake footpath or kerb and channel works.
Please note: Development sites with endorsed engineering plans can apply directly for a vehicle crossing permit.
Apply online
Required documentation:
If approved, Council will provide written consent.
A vehicle crossing permit is always required to repair, modify, relocate, reconstruct, or construct an additional vehicle crossing, or to undertake footpath or kerb and channel works.
Apply for Vehicle Crossing Permit
To undertake works on Council-owned roads, footpaths or nature strips, builders and contractors are required to have a Temporary Traffic Management (TTM) Permit (formerly named a Road and Footpath Closure Permit) before works commence.
Apply for Temporary Traffic Management Permit
For further assistance in the application process, contact Engineering Services on (03) 9298 4292.