Evelyn Road, Ringwood North, infrastructure improvement works

  • Project categoryInfrastructure improvement works
  • StatusPlanned
  • Approx. start dateOctober 2026

About the project

Works along Evelyn Road, at the intersection with Felix Crescent in Ringwood North are anticipated to commence in October 2026.

The works are a continuation to Council’s previous infrastructure improvement works which occurred within Evelyn Road near Loughnan Road in early 2024.

The works will include:

  • Continuation of the footpath construction on the west side of the road between Loughnan Road and Felix Crescent.
  • Construction of two pedestrian refuges to support safe pedestrian crossing and encourage lower speeds on approach to the Felix Crescent intersection.
  • Construction of a raised pavement outside no. 2 Felix Crescent and concrete speed cushions outside 3 Park Road to reduce and control vehicle speeds.
  • Modifications to the Felix Crescent and Evelyn Road intersection to support a pedestrian crossing and improve bus turning movements.
  • Reconstruction and realignment of the existing footpath outside no. 2 Park Road. The footpath will be raised to reduce overflowing of stormwater from the road.
  • Road resurfacing and pavement rehabilitation between Felix Crescent and Loughnan Road.
  • Associated vehicle crossing and kerb reconstruction to support the above works.
  • Associated road linemarking and signage.

Current road condition:

Evelyn Road.jpg

 

Evelyn Road alt.jpg

Next steps

Preliminary design plans are available to view, linked in the Design plans section on this page.

Subject to contractor availability, works are expected to commence in October 2026.

More information on construction timings and impacts will become available as the project progresses. 

Location

Evelyn Road, Ringwood North 3134  View map

Google Map