Heywood Street road rehabilitation

  • Project categoryRoads and drainage
  • StatusPlanned
  • Approx. start dateEarly 2026
Heywood St Ringwood

Road rehabilitation works are planned for Heywood Street in Ringwood between Barkly Street and Sylvia Grove to address the deterioration of the kerb and channel, and road pavement.

Works include:

  • Reconstruction of concrete kerb and channel
  • Reconstruction of vehicle crossovers
  • Reconstruction of footpath segments and construction of new footpath connections at Sylvia Grove
  • Renewal of the raised pavement at 20 Heywood Street
  • New stormwater drainage infrastructure
  • Asphalt resurfacing of the road pavement

These works are intended to provide improved drainage conditions for the properties west of Heywood Street between Keith Grove and Barkly Street that are considered subject to flooding. Kerb and footpath heights will be lifted along this section of Heywood Street to improve capture of floodwater in the roadway. This will aim to reduce floodwater overflow onto footpath and properties.

Construction is planned to begin in early 2026. Further information, including confirmed construction timelines, works staging and construction impacts, will be provided in due course.

View the plans

Heywood-St-Ringwood-work-plans.pdf(PDF, 6MB)  

Further information

For further information, or to provide feedback, you can contact Council’s Councils Project Engineer, Douglas Smith on (03) 9298 4357 or at maroondah@maroondah.vic.gov.au 

Contact details

Location

Heywood Street, Ringwood 3134  View map

Google Map