Mullum Mullum Road improvements

  • Project categoryRoad and pedestrian safety improvements
  • StatusNearing completion
  • Approx. start dateJanuary 2025
  • Approx. end date22 May 2026

Road and pedestrian safety improvements within the school zone of Mullum Mullum Road, Ringwood between Byron Street and Panfield Avenue are nearing completion. 

Whilst the main works are complete, smaller supporting works will continue into late May. This includes the finalisation of line marking and signage, and the construction of a new concrete pad located at the nearby bus stop. These works are due for completion by 22 May.

About the project

The works will enhance pedestrian safety and accessibility, reduce vehicle speeds and clarify parking and traffic lane arrangements.

The main works included:

  • Formalisation of parking and traffic lanes.
  • Road narrowing at the Byron Street and Panfield Avenue intersections, and school entrance.
  • Relocation and upgrade of the existing children’s crossing to a raised children’s crossing closer to the Panfield Avenue intersection.
  • Installation of two complementary raised pavements evenly spaced along the length of road.
  • Pavement marked treatments at the Byron Street and Panfield Avenue intersections to highlight pedestrian walkways.
  • Addition of formal parking lane on the north side of the road along the Norwood Secondary College and Mullum Primary School frontage.
  • Construction of 10 indented parking spaces on the south side of the road.
  • Removal of 10 trees, that were at the end of their useful life expectancy, on the south side of the road to support the indented parking spaces.
  • Associated drainage, signage and line marking modifications. 

Further information

For more information please contact Council's Engineering team on 1300 88 22 33 or via maroondah@maroondah.vic.gov.au =

Contact details

Location

Mullum Mullum Road, between Byron Street and Panfield Avenue, Ringwood 3134  View map

Google Map