Lincoln Road upgrades - Stage 2

Croydon
Categories:
  • Roads and carparks
In progress
Approx. start date:14 May 2018
Council received funding from Federal Roads to Recovery for the rehabilitation of Lincoln Road between Dorset Road and Hull Road in Croydon.
City-improvements-lincoln-road.jpg

Lincoln Road is a key link road connecting Maroondah to the Shire of Yarra Ranges and has been identified for rehabilitation and upgrade due to condition of the road and number of traffic safety issues. As the section of Lincoln Road from Newman Road to Hull Road forms the municipal boundary between Yarra Ranges Council and Maroondah City Council, this portion of the project is being jointly implemented by both Councils with project management of the overall project being undertaken by Maroondah City Council.

Staging of works

The Lincoln Road upgrades will be undertaken in two main stages:

  • Stage 1 – Hull Road (“Five Ways” roundabout) to Dornoch Court - completed 2019
  • Stage 2 – Dornoch Court to Dorset Road.

Stage 2 is currently out to tender, with construction to be undertaken in 2020.

Key elements of the works

  • renewal of the existing road surface and pavement
  • on road bicycle lanes from Dorset Road to Hull Road
  • widening of bicycle lanes opposite side roads to allow vehicles to overtake right turning vehicles. Bicycles will have priority in these locations
  • rationalisation of service road entry and exit points to reduce conflict points
  • protection of existing landscaping regions and provision of additional landscaping areas
  • formalisation of parking and vehicle turnaround areas
  • construction of missing lengths within footpath network;
  • pedestrian operated signals near between Mount View Parade and Allendale Road
  • construction of localised sections of kerb and channel along Lincoln Road
  • sealing of entrance/exits to service roads to minimise gravel washout into main thoroughfare. This will also include the construction of vehicle crossings at the edge of the roadway for approximately 5m (not for the full length from the roadway to the property boundary).

Further details and key elements of the works, including changes to the project scope and design since the concept design can be found in the project summary:

Project summary  (pdf, 25KB)

Downloadable documents

Plans can be viewed by appointment at Council's City Offices in Braeside Avenue Ringwood, or viewed below. Please note some of the files below are quite large when downloading.

Civil design plans

Civil Design - Layout plans extract (combined stages 1 and 2)  (pdf, 9MB)

Civil Design - Linemarking plans extract (combined stages 1 and 2)  (pdf, 8MB)

Civil Design (Stage 1 – draft detailed design)  (pdf, 31MB)

Civil Design (Stage 2 – draft detailed design)  (pdf, 23MB)

Footpath design plans

Footpath Design – North side, Newman Road to Hull Road (five ways roundabout)  (pdf, 7MB)

Lighting design plans

Lighting Design – Stage 1  (pdf, 2MB)

Lighting Design – Stage 2  (pdf, 1MB)

Landscape design plans

Landscape Design – Stage 1  (pdf, 8MB)

Landscape Design – Stage 2  (pdf, 7MB)

Traffic signal plan

Traffic Signal Plan  (pdf, 466KB)

Vegetation removal plan

Vegetation removal plan  (pdf, 6MB)

Waste collection plan

Waste collection plan  (pdf, 8MB)

Further information

For further information on the proposed road asset enhancement works, contact Council’s Project Engineer, Matthew Wright on 9298 4357.